HOME > News

Proinso Completed a 50kW Rooftop PV Installation in Mumbai

published: 2014-11-05 14:56

PROINSO recently supplied integrated solution including Jinko modules and ZeverSolar string inverters to a rooftop project located close to Mumbai. The installation marks ZeverSolar’s entrance into the emerging Indian market.

This supply was completed under the recently announced PPA model that PROINSO has launched in India. Under this model, Proinso will offer a new funding program available for projects above 100 kW. The product will be flexible with Build Own Operate & Build Own Transfer finance models, and will permit customers to have the highest quality equipment and optimized system without the CAPEX hurdle.

Mr. Kunal Chandra, head of Proinso India, said: “The Indian market is responding very positively to the value proposition that Zeversolar offers. We have recently closed another 200 KW opportunity in Western part of India for supply to a SECI project. It is under this policy that we see the most demand with the cost and quality offering.”

This 50kWp Roof top project close to Mumbai uses Jinko 250Wp modules and Eversol TLC20K inverters. Modules are mounted along the slopped roof. Two inverters of Zeversolar 20 kW are wall mounted outdoors. Installation & commissioning of ZeverSolar string inverters being highly efficient.

This site with ZeverSolar string inverters also has remote monitoring features enabled to view and measure the performance of the system through internet from anywhere in the world. Thanks to ZeverSolar portal called SolarCloud which is free to use and has a very user friendly interface.

Power Monitoring Unit (PMU) acts as a mediator between the inverters and monitoring software. It can also act in Master and Slave combination and connect upto 50 inverters. Also RRCR (Radio Ripple Control Receiver) can be connected to monitor the plant load and avoid reverse flow of power into grid.

announcements add announcements     mail print
Share
Recommend

US energy storage five-year market outlook

published: 2024-03-28 17:24  |  tags: